Data as of Oct 9, 2026 · Next refresh by Nov 13, 2026 · 27 changes this refresh
Who is building data centers in Texas, where, and for how much
We track 42 Texas data center projects, 25 of them building or running. The largest disclosed figure is Stargate Frontier, $25B announced (full campus); its state filings total $10.6B across 11 registered buildings. 14 of the 21 projects with a sourced power source plan on-site gas generation, alone or alongside the grid. Since August 3, 2026, ERCOT has paused energizing new data centers of 75 MW or more while the Governor's audit runs; its report is due December 10, 2026.
- registered with the state (buildings only)
- $35.9B
- TDLR estimated construction cost, 19 projects. Not total spend.
- largest announced (full campus)
- $25B
- Stargate Frontier. 13 projects announce a figure; scopes differ, never added.
- projects tracked
- 42
- 25 building or running · 47 more state filings, listed separately
- plan on-site gas
- 14 of 21
- Of projects with a sourced power source
No projects in this view.
Text description of the map
- Permian Basin: 10 projects. Chevron and Microsoft, Project Kilby (Reeves County) (announced); GW Ranch and Amazon, Pecos County (announced); Prometheus Hyperscale and Istmo, Reeves County (announced); PowerBridge Alpha Digital Campus, Reeves County (announced); NRG and LandBridge, Reeves County (potential) (announced); Poolside Project Horizon, Pecos County (paused); Texas Critical Data Centers, Odessa (announced); Nscale and Ionic, Ward County (under construction); Crusoe, Howard County (Elbow Creek) (record only); Lancium, Fort Stockton (record only).
- West Texas: 10 projects. Stargate Abilene (partly operating); Crusoe Abilene, Microsoft campus (under construction); Stargate Frontier, Shackelford County (under construction); Google, Haskell County (under construction); Meta, El Paso (under construction); Galaxy Helios, Dickens County (under construction); IREN Sweetwater, Nolan County (announced); Cipher Barber Lake, Mitchell County (under construction); Stargate Abilene expansion (+600 MW) (cancelled); Crusoe, Wilbarger County (record only).
- North Texas (Dallas-Fort Worth): 8 projects. Compass Datacenters, Red Oak (record only); Compass Datacenters, Allen (operating); CoreWeave, Plano (operating); Digital Realty, Dallas (operating); Edged, Irving (partly operating); QTS, Fort Worth (operating); Riot Platforms, Corsicana (operating); STACK Infrastructure, Lancaster (DFW02) (under construction).
- Panhandle: 6 projects. Fermi America Project Matador, Carson County (under construction); Google, Armstrong County (Crusoe Goodnight) (under construction); Google Meitner Energy Center, Gray and Roberts Counties (under construction); IREN Childress (partly operating); TeraWulf and Fluidstack, Abernathy (under construction); Amazon, Floydada (announced).
- Central Texas: 5 projects. Stargate Milam County (under construction); CloudBurst San Marcos GigaCenter (under construction); Nexus Data Centers, Hubbard (under construction); Skybox Datacenters, Hutto (under construction); Switch, Round Rock (partly operating).
- Houston area: 1 project. Amazon, Boling (announced).
- South Texas: 1 project. Oracle, Bexar County (record only).
- Other: 1 project. Diode Ventures, Cedar Creek Lake (cancelled).
Embed this map
Copy this into your page. The view links back here.
<iframe src="https://modalpoint.com/texas-data-center-map/embed" title="Texas data center map" width="100%" height="760" loading="lazy"></iframe>
<p>Map: <a href="https://modalpoint.com/texas-data-center-map">ModalPoint Texas Data Center Map</a></p>Every tracked Texas data center project
Click a row for the full record with a source for every figure. Filters change the address bar, so any view can be shared.
Selling into data center campuses? ModalPoint helps you win that business with buyer mapping, positioning and a go-to-market plan.
Book a 30-minute call42 projects tracked, 25 building or running, as of Oct 9, 2026. 30 minutes, no obligation either way.
| Where | Power | Dollars, sort by | Builders and suppliers | |||||
|---|---|---|---|---|---|---|---|---|
| NEWVantage Data Centers · for Oracle and OpenAI | Albany area (Hamby) County | Under construction | On-site gas | Ann$25B campus TDLR$10.6B 11 filed | IT1,400 | Q4 2026 · P | Kiewit | 3/6 evidence signals presentMedium confidence |
Stargate Frontier, Shackelford CountyVantage Data Centers; tenants Oracle and OpenAI. Who builds and supplies
Evidence: 3 of 6 signalsPresent: State filing (TDLR), Air permit, Confirmed groundbreaking. Not found: Local incentive record, Named contractor, Supply contract. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: epoch.ai Legal entitiesVantage Data Centers TX301, LLC to TX310, LLC (10 entities) Vantage Data Centers TX301, LLC; Vantage Data Centers TX302, LLC; Vantage Data Centers TX303, LLC; Vantage Data Centers TX304, LLC; Vantage Data Centers TX305, LLC; Vantage Data Centers TX306, LLC; Vantage Data Centers TX307, LLC; Vantage Data Centers TX308, LLC; Vantage Data Centers TX309, LLC; Vantage Data Centers TX310, LLC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| Crusoe · for Oracle and OpenAI | Abilene County | Partly operating | Hybrid | Ann$15B JV financing TDLR$4.49B 14 filed Inc$3.5B | Design1,200 | Q4 2026 · T | DPR ConstructionRosendinSouthland Industries+2 | 4/6 evidence signals presentMedium confidence |
Stargate AbileneCrusoe; developer Lancium; tenants Oracle and OpenAI. Who builds and supplies
Seller segments: Electrical and EPC Evidence: 4 of 6 signalsPresent: State filing (TDLR), Local incentive record, Named contractor, Confirmed groundbreaking. Not found: Air permit, Supply contract. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: epoch.ai Legal entitiesCrusoe Energy Systems; Data Center 3-8 Hold Co, LLC; LANCIUM ABILENE LLC Crusoe Energy Systems; Data Center 3-8 Hold Co, LLC; LANCIUM ABILENE LLC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWCloudBurst Data Centers | San Marcos / New Braunfels area and Counties | Under construction | On-site gas | Ann$14.5B campus Incon file | Design1,200 | Q4 2026 · C | Energy Transfer | 3/6 evidence signals presentMedium confidence |
CloudBurst San Marcos GigaCenterCloudBurst Data Centers. Who builds and supplies
Seller segments: Midstream gas Evidence: 3 of 6 signalsPresent: Local incentive record, Supply contract, Confirmed groundbreaking. Not found: State filing (TDLR), Air permit, Named contractor. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
· Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWMeta · for Meta | El Paso County | Under construction | Hybrid | Ann$10B campus TDLR$289M 1 filed Inc$800M | Gen366 Design1,000 | 2028 · C | StantecEnchanted Rock | 4/6 evidence signals presentHigh confidence |
Meta, El PasoMeta; tenant Meta. Who builds and supplies
Seller segments: On-site generation Evidence: 4 of 6 signalsPresent: State filing (TDLR), Local incentive record, Supply contract, Confirmed groundbreaking. Not found: Air permit, Named contractor. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesWurldwide LLC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWIREN · for Microsoft | Childress County | Partly operating | Grid | Ann$5.8B GPU capex | Design750 | 2026 · C | Not publicly named (checked Oct 9, 2026) | 0/6 evidence signals presentHigh confidence |
IREN ChildressIREN; tenant Microsoft. Who builds and supplies
Evidence: 0 of 6 signalsPresent: none. Not found: State filing (TDLR), Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
· Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWFermi America · for TensorWave | Amarillo (site ~17 mi NE, adjacent to Pantex) County | Under construction | On-site gas | Ann$2B phase Incon file | Design11,000 | No public date | PrimorisTSKSiemens Energy | 5/6 evidence signals presentMedium confidence |
Fermi America Project Matador, Carson CountyFermi America; tenant TensorWave. Who builds and supplies
Seller segments: On-site generation, Electrical and EPC Evidence: 5 of 6 signalsPresent: Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Not found: State filing (TDLR). Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: newschannel10.com · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| CoreWeave (hosted by Flexential) | Plano County | Operating | Not stated | Ann$1.6B other scope TDLR$212M 2 filed Inc$1.6B | Not published | Q4 2023 · P | Critical Project Services | 2/6 evidence signals presentMedium confidence |
CoreWeave, PlanoCoreWeave (hosted by Flexential). Who builds and supplies
Evidence: 2 of 6 signalsPresent: State filing (TDLR), Local incentive record. Not found: Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesCoreWeave, Inc. · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| NEWFluidstack-led joint venture (TeraWulf) · for Fluidstack | Abernathy County | Under construction | Not stated | Ann$1.34B other scope | IT168 | 2026 · C | Not publicly named (checked Oct 9, 2026) | 0/6 evidence signals presentHigh confidence |
TeraWulf and Fluidstack, AbernathyFluidstack-led joint venture (TeraWulf); tenant Fluidstack. Who builds and supplies
Evidence: 0 of 6 signalsPresent: none. Not found: State filing (TDLR), Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: investors.terawulf.com · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWCrusoe · for Google | Claude County | Under construction | Hybrid | Ann$1B phase TDLR$4.58B 10 filed Incon file | Design530 | Q3 2027 · T | DPR ConstructionRosendinSouthland Industries+2 | 5/6 evidence signals presentMedium confidence |
Google, Armstrong County (Crusoe Goodnight)Crusoe; tenant Google. Who builds and supplies
Seller segments: Electrical and EPC Evidence: 5 of 6 signalsPresent: State filing (TDLR), Local incentive record, Air permit, Named contractor, Confirmed groundbreaking. Not found: Supply contract. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: ksat.com Legal entitiesGN DC1 LLC; GN DC1, LLC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| Switch | Round Rock County | Partly operating | Not stated | Ann$250M other scope TDLR$20M 1 filed Inc$80M | Not published | Q2 2028 · T | Corgan | 2/6 evidence signals presentHigh confidence |
Switch, Round RockSwitch. Who builds and supplies
Evidence: 2 of 6 signalsPresent: State filing (TDLR), Local incentive record. Not found: Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesSwitch, Ltd. · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| Digital Realty | Dallas County | Operating | Not stated | Ann$104M other scope Inc$104M | Not published | No public date | Not yet checked | 1/6 evidence signals presentMedium confidence |
Digital Realty, DallasDigital Realty. Who builds and supplies
Evidence: 1 of 6 signalsPresent: Local incentive record. Not found: State filing (TDLR), Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesDigital Realty Trust, L.P. · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| Cipher Digital · for Fluidstack | Colorado City County | Under construction | Grid | Inc$3.3B | Design300 | Q3 2026 · P | Not publicly named (checked Oct 9, 2026) | 1/6 evidence signals presentMedium confidence |
Cipher Barber Lake, Mitchell CountyCipher Digital; tenant Fluidstack. Who builds and supplies
Evidence: 1 of 6 signalsPresent: Local incentive record. Not found: State filing (TDLR), Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: investors.cipherdigital.com · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| Compass Datacenters | Allen County | Operating | Not stated | Incon file | Not published | No public date | Not yet checked | 1/6 evidence signals presentMedium confidence |
Compass Datacenters, AllenCompass Datacenters. Who builds and supplies
Evidence: 1 of 6 signalsPresent: Local incentive record. Not found: State filing (TDLR), Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesCompass Datacenters DFW LLC · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| NEWCrusoe · for Microsoft | Abilene County | Under construction | On-site gas | No figure published | Design900 | 2027 · C | Energy Transfer | 2/6 evidence signals presentHigh confidence |
Crusoe Abilene, Microsoft campusCrusoe; tenant Microsoft. Who builds and supplies
Seller segments: Midstream gas Evidence: 2 of 6 signalsPresent: Air permit, Supply contract. Not found: State filing (TDLR), Local incentive record, Named contractor, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
· Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| Edged Energy | Irving County | Partly operating | Not stated | TDLR$178M 1 filed | IT48 | Q1 2025 · C | MG2ThermalWorks | 2/6 evidence signals presentMedium confidence |
Edged, IrvingEdged Energy. Who builds and supplies
Evidence: 2 of 6 signalsPresent: State filing (TDLR), Named contractor. Not found: Local incentive record, Air permit, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesEdged Dallas LLC · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| NEWGalaxy Digital · for CoreWeave | Afton / Spur area County | Under construction | Grid | TDLR$4.3B 4 filed | Design1,600 | Q4 2027 · T | StantecSTG Design | 1/6 evidence signals presentHigh confidence |
Galaxy Helios, Dickens CountyGalaxy Digital; tenant CoreWeave. Who builds and supplies
Evidence: 1 of 6 signalsPresent: State filing (TDLR). Not found: Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: datacenterdynamics.com Legal entitiesGalaxy Helios I LLC; Galaxy Helios II LLC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWGoogle and Intersect · for GoogleLow confidence | Pampa area and Counties | Under construction | Renewables plus storage | TDLR$1.2B 3 filed | Gen1,000 | Q2 2028 · T | HDR Engineering | 1/6 evidence signals presentLow confidence |
Google Meitner Energy Center, Gray and Roberts CountiesGoogle and Intersect; tenant Google. Who builds and supplies
Evidence: 1 of 6 signalsPresent: State filing (TDLR). Not found: Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesIP Meitner Land LLC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWGoogle · for Google | Haskell County | Under construction | Renewables plus storage | TDLR$800M 2 filed Inc$1B | Not published | Q2 2026 · C | HDR Engineering | 2/6 evidence signals presentMedium confidence |
Google, Haskell CountyGoogle; tenant Google. Who builds and supplies
Evidence: 2 of 6 signalsPresent: State filing (TDLR), Local incentive record. Not found: Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: powermag.comhaskellcountytx.gov Legal entitiesHomebound Group LLC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWNexus Data Centers | Hubbard County | Under construction | On-site gas | TDLR$800M 2 filed | Design612 | Q4 2026 · C | Energy TransferHDR EngineeringAirJoule | 3/6 evidence signals presentMedium confidence |
Nexus Data Centers, HubbardNexus Data Centers. Who builds and supplies
Seller segments: Midstream gas, Water Evidence: 3 of 6 signalsPresent: State filing (TDLR), Air permit, Supply contract. Not found: Local incentive record, Named contractor, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesNexus Data Centers Hubbard LLC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWIonic Digital (landlord) and Nscale · for Microsoft | Barstow County | Under construction | Not stated | No figure published | Design234 | No public date | Not publicly named (checked Oct 9, 2026) | 0/6 evidence signals presentMedium confidence |
Nscale and Ionic, Ward CountyIonic Digital (landlord) and Nscale; tenant Microsoft. Who builds and supplies
Evidence: 0 of 6 signalsPresent: none. Not found: State filing (TDLR), Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: SEC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| QTSLow confidence | Fort Worth County | Operating | Not stated | TDLR$472M 3 filed | Not published | Q4 2027 · T | Corgan | 1/6 evidence signals presentLow confidence |
QTS, Fort WorthQTS. Who builds and supplies
Evidence: 1 of 6 signalsPresent: State filing (TDLR). Not found: Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesQTS Investments Property Ft. Worth LLC · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| Riot PlatformsLow confidence | Corsicana County | Operating | Not stated | TDLR$400M 1 filed | Not published | Q2 2028 · T | Not yet checked | 1/6 evidence signals presentLow confidence |
Riot Platforms, CorsicanaRiot Platforms. Who builds and supplies
Evidence: 1 of 6 signalsPresent: State filing (TDLR). Not found: Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesRIOT PLATFORMS INC · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| Skybox DatacentersLow confidence | Hutto County | Under construction | Not stated | TDLR$1.15B 3 filed Incon file | Not published | Q4 2028 · T | Corgan | 2/6 evidence signals presentLow confidence |
Skybox Datacenters, HuttoSkybox Datacenters. Who builds and supplies
Evidence: 2 of 6 signalsPresent: State filing (TDLR), Local incentive record. Not found: Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesHutto Data Center Campus Power LLC c/o Skybox Datacenters · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| STACK Infrastructure | Lancaster County | Under construction | Not stated | TDLR$822M 3 filed | Not published | 2026 · P | Corgan | 1/6 evidence signals presentMedium confidence |
STACK Infrastructure, Lancaster (DFW02)STACK Infrastructure. Who builds and supplies
Evidence: 1 of 6 signalsPresent: State filing (TDLR). Not found: Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesSl DFW02A, LLC (STACK) · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| NEWSB Energy · for OpenAI | Milam County | Under construction | Not stated | TDLR$470M 1 filed | Design1,200 | Q4 2026 · P | Corgan | 1/6 evidence signals presentMedium confidence |
Stargate Milam CountySB Energy; tenant OpenAI. Who builds and supplies
Evidence: 1 of 6 signalsPresent: State filing (TDLR). Not found: Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: epoch.aiopenai.com Legal entitiesMilam County Data Center LLC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWChevron (power) and Microsoft (campus) · for Microsoft | Pecos area County | Announced | On-site gas | Ann$9B power only | IT2,000 Gen2,670 | 2028 · C | ChevronGE VernovaSolar Turbines (Caterpillar)+1 | 2/6 evidence signals presentMedium confidence |
Chevron and Microsoft, Project Kilby (Reeves County)Chevron (power) and Microsoft (campus); tenant Microsoft. Who builds and supplies
Seller segments: Midstream gas, On-site generation, Water, Land Evidence: 2 of 6 signalsPresent: Air permit, Supply contract. Not found: State filing (TDLR), Local incentive record, Named contractor, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: orrick.com · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWAmazon Data Services · for Amazon | Boling County | Announced | Not stated | TDLR$3B 10 filed | Not published | Q3 2027 · T | Gensler | 1/6 evidence signals presentMedium confidence |
Amazon, BolingAmazon Data Services; tenant Amazon. Who builds and supplies
Evidence: 1 of 6 signalsPresent: State filing (TDLR). Not found: Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: datacenterdynamics.com Legal entitiesAMAZON DATA SERVICES, INC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWAmazon Data Services · for Amazon | Floydada County | Announced | Not stated | TDLR$1.2B 4 filed | Not published | Q2 2027 · T | Gensler | 1/6 evidence signals presentHigh confidence |
Amazon, FloydadaAmazon Data Services; tenant Amazon. Who builds and supplies
Evidence: 1 of 6 signalsPresent: State filing (TDLR). Not found: Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: datacenterdynamics.com Legal entitiesAMAZON DATA SERVICES, INC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWAmazon Data Services · for Amazon | Fort Stockton / Pecos area County | Announced | On-site gas | TDLR$900M 3 filed | Gen7,650 | Q4 2026 · T | Gensler | 2/6 evidence signals presentMedium confidence |
GW Ranch and Amazon, Pecos CountyAmazon Data Services; developer Pacifico Energy; tenant Amazon. Who builds and supplies
Seller segments: Water Evidence: 2 of 6 signalsPresent: State filing (TDLR), Air permit. Not found: Local incentive record, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: datacenterdynamics.com Legal entitiesAMAZON DATA SERVICES, INC · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWIREN | Sweetwater County | Announced | Grid | No figure published | Design2,000 | Q2 2026 · C | Not publicly named (checked Oct 9, 2026) | 0/6 evidence signals presentMedium confidence |
IREN Sweetwater, Nolan CountyIREN. Who builds and supplies
Evidence: 0 of 6 signalsPresent: none. Not found: State filing (TDLR), Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: nasdaq.com · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWNRG Energy | Reeves County | Announced | Grid | No figure published | Gen1,100 | Q4 2029 · C | LandBridge | 1/6 evidence signals presentHigh confidence |
NRG and LandBridge, Reeves County (potential)NRG Energy; developer LandBridge. Who builds and supplies
Seller segments: Land Evidence: 1 of 6 signalsPresent: Air permit. Not found: State filing (TDLR), Local incentive record, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: businesswire.com · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWPowerBridge (Liberty Energy joint venture) | Reeves County | Announced | On-site gas | No figure published | Gen2,000 | Q4 2027 · C | Liberty EnergyLandBridge | 1/6 evidence signals presentHigh confidence |
PowerBridge Alpha Digital Campus, Reeves CountyPowerBridge (Liberty Energy joint venture). Who builds and supplies
Seller segments: On-site generation, Land, Oilfield pivots Evidence: 1 of 6 signalsPresent: Supply contract. Not found: State filing (TDLR), Local incentive record, Air permit, Named contractor, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
· Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWPrometheus HyperscaleLow confidence | Pecos County | Announced | On-site gas | No figure published | Design2,500 | 2027 · C | Istmo Midstream | 1/6 evidence signals presentLow confidence |
Prometheus Hyperscale and Istmo, Reeves CountyPrometheus Hyperscale. Who builds and supplies
Seller segments: Midstream gas Evidence: 1 of 6 signalsPresent: Supply contract. Not found: State filing (TDLR), Local incentive record, Air permit, Named contractor, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
· Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWTexas Critical Data Centers (New Era Energy & Digital)Low confidence | Odessa County | Announced | On-site gas | No figure published | Design250 | Q3 2027 · C | Not publicly named (checked Oct 9, 2026) | 0/6 evidence signals presentLow confidence |
Texas Critical Data Centers, OdessaTexas Critical Data Centers (New Era Energy & Digital). Who builds and supplies
Evidence: 0 of 6 signalsPresent: none. Not found: State filing (TDLR), Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
· Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| Compass DatacentersLow confidence | Red Oak County | Record only | Not stated | Ann$300M other scope Inc$300M | Not published | 2026 · P | Not yet checked | 1/6 evidence signals presentLow confidence |
Compass Datacenters, Red OakCompass Datacenters. Who builds and supplies
Evidence: 1 of 6 signalsPresent: Local incentive record. Not found: State filing (TDLR), Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesCompass Datacenters DFW III, LLC · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| CrusoeLow confidence | Big Spring (Elbow Creek area, south of town) County | Record only | Not stated | Incon file | Not published | No public date | Not yet checked | 1/6 evidence signals presentLow confidence |
Crusoe, Howard County (Elbow Creek)Crusoe. Who builds and supplies
Evidence: 1 of 6 signalsPresent: Local incentive record. Not found: State filing (TDLR), Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesCrusoe Energy Systems, LLC · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| CrusoeLow confidence | Vernon area County | Record only | Not stated | Incon file | Not published | No public date | Not yet checked | 1/6 evidence signals presentLow confidence |
Crusoe, Wilbarger CountyCrusoe. Who builds and supplies
Evidence: 1 of 6 signalsPresent: Local incentive record. Not found: State filing (TDLR), Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesCrusoe Energy System, LLC · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| LanciumLow confidence | Fort Stockton County | Record only | Not stated | Incon file | Not published | No public date | Not yet checked | 1/6 evidence signals presentLow confidence |
Lancium, Fort StocktonLancium. Who builds and supplies
Evidence: 1 of 6 signalsPresent: Local incentive record. Not found: State filing (TDLR), Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesLancium LLC · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| OracleLow confidence | San Antonio area County | Record only | Not stated | Incon file | Not published | No public date | Not yet checked | 1/6 evidence signals presentLow confidence |
Oracle, Bexar CountyOracle. Who builds and supplies
Evidence: 1 of 6 signalsPresent: Local incentive record. Not found: State filing (TDLR), Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
Legal entitiesOracle America, Inc. · Last verified Oct 9, 2026; contractors, suppliers and power not yet checked. Data as of Oct 9, 2026. | ||||||||
| NEWPoolside | Fort Stockton area County | PausedCoreWeave anchor lease terminated April 2026; project paused and seeking a partner (DCD citing the Financial Times, not a company statement).. | On-site gas | No figure published | Design2,000 | 2027 · P | Longfellow Ranch | 0/6 evidence signals presentMedium confidence |
Poolside Project Horizon, Pecos CountyPoolside. Who builds and supplies
Seller segments: Land Evidence: 0 of 6 signalsPresent: none. Not found: State filing (TDLR), Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: datacenterdynamics.com · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWDiode Ventures | Cedar Creek Lake area County | CancelledDeveloper told county officials it would not pursue the site after local opposition and the Governor's June 2026 data center standards.. | Not stated | No figure published | Not published | No public date | Not publicly named (checked Oct 9, 2026) | 0/6 evidence signals presentMedium confidence |
Diode Ventures, Cedar Creek LakeDiode Ventures. Who builds and supplies
Evidence: 0 of 6 signalsPresent: none. Not found: State filing (TDLR), Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: argusmedia.comnewschannel6now.com · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
| NEWCrusoe | Abilene County | CancelledEpoch AI: OpenAI reversed course and directed capacity elsewhere; Microsoft then took the adjacent 900 MW. | Not stated | No figure published | Design600 | No public date | Not publicly named (checked Oct 9, 2026) | 0/6 evidence signals presentMedium confidence |
Stargate Abilene expansion (+600 MW)Crusoe. Who builds and supplies
Evidence: 0 of 6 signalsPresent: none. Not found: State filing (TDLR), Local incentive record, Air permit, Named contractor, Supply contract, Confirmed groundbreaking. Status and confidence
Dollars: three types, never added
Megawatts: IT, generation and design are separate
Where, when and power
More sources: crusoe.ai · Last verified Oct 9, 2026. Data as of Oct 9, 2026. | ||||||||
No projects match these filters. 0 of 42. | ||||||||
Selling into this project? ModalPoint helps you win business on campuses like it with buyer mapping, positioning and a go-to-market plan.
Book a 30-minute call42 projects tracked, 25 building or running, as of Oct 9, 2026. 30 minutes, no obligation either way.
Dollars. Ann = announced by the company or in a filing, scope shown. TDLR = estimated construction cost registered with the Texas Department of Licensing and Regulation, buildings only. Inc = investment committed in a local incentive agreement.
MW. IT = IT load. Gen = generation capacity. Design = planned capacity as the source states it, when the source does not say whether it is IT load or generation. The three are never added.
Online. Earliest known milestone (first power or completion). Basis: T = TDLR filing, C = company, R = county record, P = trade press or analyst. Dashes mean no public date.
Evidence. Signals present: state filing, local incentive record, air permit, named contractor, supply contract, confirmed groundbreaking. Confidence. High = primary document read. Medium = one primary source read secondhand, or two secondary. Low = single trade report or unverified.
Record only = listed in a county or state record; current build state not confirmed.
Three dollar figures per project, never added together
One bar per figure on one shared scale, 0 to $25B. A project can have one, two or three. Missing types are left out, not zeroed.
- No announced figure (shown by their other figures)
When each project builds and powers up
Bars run from groundbreaking to completion. Diamonds mark first power. Dashed means the date comes from press or a county record, not the company or a state filing. Letters at the end of a bar give the basis: T state filing, C company, R county, P press or analyst.
Scroll sideways to see every quarter.
No dated projects in this view.
No public date yet: 7 projects. Nscale and Ionic, Ward County, Crusoe, Wilbarger County, Crusoe, Howard County (Elbow Creek), Compass Datacenters, Allen, Digital Realty, Dallas, Lancium, Fort Stockton, Oracle, Bexar County.
Dated before Q3 2026 and not drawn: Fermi America Project Matador, Carson County (groundbreaking Oct 2025, company statement); IREN Sweetwater, Nolan County (first power May 1, 2026, company statement); CoreWeave, Plano (completion Dec 31, 2023, trade press).
Stargate Abilene: before and after
The same 6.4 by 4 km frame north of Abilene, four years apart: ranch land with one graded pad in July 2022, a campus of data center halls in October 2026. The 2026 image is 30 m satellite imagery, so it shows rooftops and pads, not detail.
Before: July 2022
After: October 2026- Announced
- $15B (JV financing)
- State-filed (TDLR)
- $4.49B across 14 registrations, buildings only
- Incentive-committed
- $3.5B
- Named contractors
- DPR Construction, Rosendin, Southland Industries, Mortenson
What is inside one

This tracker shows who is building where. To see what they are building, take apart our interactive AI data hall: the power path from the generators to every rack, the coolant path out to the cooling towers, and where AI fits in the control systems. The walk-through is in Anatomy of an AI data hall.
The Governor's audit asks for the fields this page already tracks
On August 3, 2026 the Governor directed the PUC and ERCOT to require each data center to disclose its incentives, projected electricity use and on-site generation, projected water use and sources, cooling technology and community impact measures. Source: the Governor's letter to PUC Chair Gleeson and ERCOT CEO Vegas. ERCOT's pause on energizing data centers of 75 MW or more and the December 10, 2026 report date are from ERCOT Board Item 14, September 14-15, 2026.
| Audit field | Where it appears here | Projects with a sourced value | Projects where it is not public |
|---|---|---|---|
| State and local tax incentives, grants, abatements or other public financial assistance received or expected | Dollars column, Inc: program and amount where an agreement states one | 17 of 42 | 25 of 42 |
| Projected annual and peak electricity consumption | MW column (IT load, generation, design capacity). Capacity, not annual energy: no project states projected annual and peak consumption | 25 of 42 (capacity only) | 17 of 42 |
| Progress on on-site electric generation, including generation type | Power column and the generation-equipment role. Projects planning on-site gas, alone or with the grid | 14 of 42 (4 name a generation-equipment supplier) | 28 of 42 |
| Projected annual and peak water consumption and anticipated water sources | Record, Water: source and cooling note where one is published | 6 of 42 (sources, not volumes) | 36 of 42 |
| Cooling technology | Not a tracked field yet; cooling appears only in water notes | not tracked | n/a |
| Community impact measures | Not a tracked field yet | not tracked | n/a |
The gaps are the point: this is what the public record shows today.
What you sell, and who is already buying it
Seven kinds of work are bought for these campuses. Open yours to see the named deals, then filter the table to the projects that carry them.
Midstream gas supply to campuses5 projects tagged
Firm gas transportation, last-mile laterals and, in the Permian, ethane as a second fuel.
Selling gas supply or pipeline capacity to data center campuses? ModalPoint helps you win that business with buyer mapping, positioning and a go-to-market plan.
Book a 30-minute callTracked projects tagged Midstream gas: 5 of 42, as of Oct 9, 2026. 30 minutes, no obligation either way.
On-site gas generation4 projects tagged
Turbines, reciprocating engines and packaged power, bought either by the plant owner who sells power or by the developer.
Selling turbines, engines or packaged power to data center campuses? ModalPoint helps you win that business with buyer mapping, positioning and a go-to-market plan.
Book a 30-minute callTracked projects tagged On-site generation: 4 of 42, as of Oct 9, 2026. 30 minutes, no obligation either way.
Electrical, medium-voltage and EPC3 projects tagged
Substations, transmission, medium-voltage work and multi-prime construction.
Selling substation, medium-voltage or EPC work to data center campuses? ModalPoint helps you win that business with buyer mapping, positioning and a go-to-market plan.
Book a 30-minute callTracked projects tagged Electrical and EPC: 3 of 42, as of Oct 9, 2026. 30 minutes, no obligation either way.
Water sourcing and treatment3 projects tagged
Make-up water, brackish groundwater, treated produced water and cooling-water technology.
Selling water supply or treatment to data center campuses? ModalPoint helps you win that business with buyer mapping, positioning and a go-to-market plan.
Book a 30-minute callTracked projects tagged Water: 3 of 42, as of Oct 9, 2026. 30 minutes, no obligation either way.
Land, surface rights and mineral owners4 projects tagged
Powered land, surface rights and option leases near the Waha gas hub.
Offering land or surface rights to data center developers? ModalPoint helps you win that business with buyer mapping, positioning and a go-to-market plan.
Book a 30-minute callTracked projects tagged Land: 4 of 42, as of Oct 9, 2026. 30 minutes, no obligation either way.
Site preparation and civil0 projects tagged
Land clearing, grading and civil work.
No sourced deal found yet. See the gap note.
Selling site prep or civil work to data center campuses? ModalPoint helps you win that business with buyer mapping, positioning and a go-to-market plan.
Book a 30-minute callTracked projects tagged Site prep: 0 of 42, as of Oct 9, 2026. 30 minutes, no obligation either way.
Oilfield-services and compression pivots1 project tagged
Oilfield-services and compression companies selling power as a new line of business.
Taking oilfield-services or compression capacity into data center power? ModalPoint helps you win that business with buyer mapping, positioning and a go-to-market plan.
Book a 30-minute callTracked projects tagged Oilfield pivots: 1 of 42, as of Oct 9, 2026. 30 minutes, no obligation either way.
Companies on more than one project
47 more state filings we have not confirmed as projects
These are Texas Department of Licensing and Regulation filings for data centers that do not match any project above. Registered cost is the filer's estimate for buildings. $24.2B total, listed separately and never added to the projects above. A filing becomes a project here only after a second source (company, county or utility) confirms it.
| Filing Owner of record | Where | Registered cost | Buildings (registrations) | Start to completion | Design firm | Possible match |
|---|---|---|---|---|---|---|
| txf-2027000835 Childress DC3, LLCProject Hyper - Childress | Childress, Childress County525 C CO RD 23 | $2.4B | 1 | 2026-10-05 to 2028-05-31 | HKS, Inc. | Press (DCD, Baxtel) ties 'Project Hyper' to Crusoe and Lancium's 1.4 GW Childress campus (three buildings at $2.4B each). Not promoted: a second source is needed.TDLR |
| txf-2027000830 Childress DC2, LLCProject Hyper - Childress | Childress, Childress County525 B CO RD 23 | $2.4B | 1 | 2026-09-01 to 2028-04-28 | HKS, Inc. | Press (DCD, Baxtel) ties 'Project Hyper' to Crusoe and Lancium's 1.4 GW Childress campus (three buildings at $2.4B each). Not promoted: a second source is needed.TDLR |
| txf-2027000824 Childress DC1, LLCProject Hyper - Childress | Childress, Childress County525 A CO RD 23 | $2.4B | 1 | 2026-07-06 to 2028-02-28 | HKS, Inc. | Press (DCD, Baxtel) ties 'Project Hyper' to Crusoe and Lancium's 1.4 GW Childress campus (three buildings at $2.4B each). Not promoted: a second source is needed.TDLR |
| txf-2026008169 DB Data Center Red Oak, LLCDataBank Red Oak - DFW11 TFO; DataBank Red Oak - DFW14 Base Building; DataBank Red Oak - DFW15 Base Building; Databank R | Red Oak, Ellis CountyStainback Rd | $1.89B | 6 | 2025-02-01 to 2029-07-31 | JHET Architects, PLLC | None found.TDLR |
| txf-2025016366 QTS Dallas I, LLCQTS DFW2 DC2; QTS DFW2 DC3; QTS DFW2-DC5; QTS DFW2-DC6 | Wilmer, Dallas County303 Mason Road | $1.23B | 4 | 2025-05-01 to 2027-09-01 | Corgan Associates, Inc.; Highland Associates | None found.TDLR |
| txf-2026026121 Rowan Digital InfrastructureAUS02 | Temple, Bell County1855 Bob White Road | $780M | 1 | 2026-08-28 to 2027-08-27 | Not listed | None found.TDLR |
| txf-2025012765 Microsoft CorporationSAT89/90 Data Center | Castroville, Medina County2995 US HWY 90 W | $765M | 1 | 2025-06-01 to 2027-07-31 | WSP USA | None found.TDLR |
| txf-2025012185 MicrosoftMicrosoft SAT93; Microsoft SAT94; SAT93; SAT94 | Medina, Medina CountyCounty Road 381 | $752M | 4 | 2025-05-13 to 2029-05-31 | Gensler Architecture, Design & Planning, P.C. | None found.TDLR |
| txf-2026001234 VANTAGE DATA CENTERS TX1 LLCTX12 TFO; VANTAGE DATA CENTER (TX12) | San Antonio, Bexar County17420 Omicron Dr | $725M | 2 | 2025-10-14 to 2028-03-30 | Jacobs; Sheehan Nagle Hartray Architects | None found.TDLR |
| txf-2025019833 Homebound Group LLCData Center THM1A; Data Center THM2A | Haskell, Haskell County10357 Loop Road | $700M | 2 | 2025-06-18 to 2028-03-15 | HDR Engineering Inc.; HDR Engineering, Inc. | Google, Haskell County. Same owner (Homebound Group LLC, Google-linked per DCD) as the Haskell project; this second site (THM1A/2A, 10357 Loop Rd) is not part of it.TDLR |
| txf-2025016916 DatabankDatabank Red Oak - DFW11; Databank Red Oak - DFW12 | Red Oak, Ellis CountyStainback Rd | $650M | 2 | 2025-12-15 to 2028-11-15 | JHET Architects | None found.TDLR |
| txf-2025010445 Lancaster Data Center Campus, LPSkybox - LAN01 - Fit Out; Skybox - LAN01 - Fit Out D2B; Skybox - Lancaster 1 Initial Improvements | Lancaster, Dallas County2401 South Dallas Ave. | $649M | 3 | 2025-03-01 to 2027-04-01 | Corgan; Corgan Associates, Inc.; Corgan Asssociates | None found.TDLR |
| txf-2026016944 QTS Dallas I, LLCQTS DFW2-DC7 | Lancaster, Dallas County1341 Sunrise Rd. | $580M | 2 | 2026-09-01 to 2027-12-01 | Corgan Associates; Corgan Associates Inc. | None found.TDLR |
| txf-2026025297 Platon Investments LLCRise 2A | Vernon, Wilbarger CountyFM 2897 S | $500M | 1 | 2026-03-31 to 2028-03-31 | Kimberly - Horn | Press (DCD) says Planton / Platon Investments LLC is Google (Googleplex mailing address); Project Rise in Vernon is not Crusoe's Wilbarger site.TDLR |
| txf-2026025053 Planton Investments LLCProject Rise 1A | Vernon, Wilbarger CountyFM 2897 S | $500M | 1 | 2026-03-31 to 2028-03-31 | Kimberly - Horn | Press (DCD) says Planton / Platon Investments LLC is Google (Googleplex mailing address); Project Rise in Vernon is not Crusoe's Wilbarger site.TDLR |
| txf-2026007415 Sharka LLCSharka Data Center - Building 5 | Midlothian, Ellis County3411 Railport Parkway | $492M | 1 | 2026-01-28 to 2027-02-24 | Not listed | None found.TDLR |
| txf-2027003019 Soluna KK Energy Service Co LLCProject Kati II | Unknown, Willacy County1392 FM 1420 Santa Monica | $472M | 1 | 2026-10-08 to 2027-10-08 | HKS, Inc. | Project Kati II, Willacy County; relationship to listed projects: none known.TDLR |
| txf-2027001701 AIL INVESTMENT LPColovore Alliance | Fort Worth, Denton County14700 Heritage Parkway | $430M | 1 | 2026-12-01 to 2028-12-01 | Ci Design | None found.TDLR |
| txf-2026023621 ALIGNED DATA CENTERS (ABERNATHY) PROPCO, LLCADC - LBB01 | Abernathy, Hale County1421 FM 54 | $425M | 1 | 2026-04-24 to 2027-11-15 | CORGAN | TeraWulf and Fluidstack, Abernathy. Aligned Data Centers (Abernathy) PropCo is in the same town as the TeraWulf and Fluidstack project; the relationship is unverified.TDLR |
| txf-2026008231 MicrosoftMicrosoft SAT82 Data Center | Castroville, Medina County3580 FM 471 N | $400M | 1 | 2026-08-13 to 2028-07-24 | Not listed | None found.TDLR |
| txf-2026019473 Lockhart Property, LLCPrime Data Center AUS-01 | Lockhart, Caldwell County1395 Bob White Road | $400M | 1 | 2026-06-01 to 2027-09-30 | Gensler | None found.TDLR |
| txf-2027000611 Beacon Point DC LLC aka Lon Hill Infrastructure LLCBeacon Point Data Center Project | Corpus Christi, Nueces County4650 FM 1694, ROBSTOWN, TX 78380 | $399M | 1 | 2026-09-28 to 2027-11-05 | Jacobs Project Management Co. | None found.TDLR |
| txf-2026023619 Giga AFM LLCBT Gateway Data Center | Royse City, Hunt County4989 COUNTY ROAD 2656, ROYSE CITY TX 75189 | $384M | 1 | 2026-08-01 to 2027-02-12 | Not listed | None found.TDLR |
| txf-2027002962 Roger Donald WallaceProject Longhorn - Building One | Cedar Creek, Bastrop CountyEarl Callahan Rd. near Walter Hoffman Road | $366M | 1 | 2026-11-30 to 2028-01-31 | Gensler | Owner of record is an individual; Gensler design.TDLR |
| txf-2025013563 Digital RealtyDigital Garland Campus; Digital Realty DFW37 Suite 105/205; Project Gold Phase 2 - DFW 39; Project Gold Phase 2 - DFW39 | Garland, Dallas County1512 Ferris Road | $331M | 5 | 2025-05-01 to 2027-10-29 | HED; JHET Architects; The M Group Architects | None found.TDLR |
| txf-2027000488 Digital Garland 2C, L.P.Digital Garland Campus | Garland, Dallas County1602 Ferris Road | $300M | 1 | 2026-06-01 to 2029-01-01 | HED | None found.TDLR |
| txf-2026001400 SDC DFWC, LPStream Data Centers - DFWC1 | Wilmer, Dallas County930 N Sunrise Rd | $300M | 1 | 2026-04-01 to 2027-10-27 | Gensler Architecture, Design and Planning P.C. | None found.TDLR |
| txf-2027000200 Colovore Austin 1, LLCColovore Hutto | Hutto, Williamson County2401 Innovation Boulevard | $280M | 1 | 2026-12-01 to 2028-12-01 | Ci Design | None found.TDLR |
| txf-2026001239 CyrusOneCyrusOne DFW10 | Tenant Fit Out | Whitney, Hill County557 CR 3610 | $275M | 1 | 2026-05-23 to 2026-10-06 | JHET Architects | None found.TDLR |
| txf-2026003003 Retained Vantage Data Centers DevelopmentVantage Data Centers TX22 | San Antonio, Bexar County5207 Rogers Road | $272M | 1 | 2025-10-22 to 2027-06-15 | Corgan | None found.TDLR |
| txf-2025015383 Aligned Data CentersDFW04 TFO; DFW04-2 | Plano, Collin County601 North Star Rd. | $240M | 2 | 2025-06-01 to 2026-12-31 | Corgan | None found.TDLR |
| txf-2026008019 Polmer LLCTemple Data Center | Temple, Bell County2230 Eberhardt Rd | $197M | 1 | 2025-12-15 to 2026-09-30 | Not listed | None found.TDLR |
| txf-2025021441 QTS Dallas I, LLCQTS DFW2-DC4 | Dallas, Dallas County794 W Beltline Road | $175M | 1 | 2025-11-15 to 2027-05-01 | Corgan Associates, Inc. | None found.TDLR |
| txf-2026018081 DB Data Center Red Oak 12, LLCDataBank Red Oak - DFW12 TFO | Red Oak, Ellis CountyStainback Rd | $155M | 1 | 2026-05-08 to 2027-10-30 | JHET Architects, PLLC | None found.TDLR |
| txf-2026014266 Digital Garland 2B, L.P.Digital Garland Campus | Garland, Dallas County1512 Ferris Road | $140M | 1 | 2026-05-06 to 2027-06-10 | HED | None found.TDLR |
| txf-2026006358 VANTAGE DATA CENTERS TX2 LLCVantage Data Centers TX21 Tenant Fit-out | San Antonio, Bexar County5207 ROGERS ROAD | $135M | 1 | 2025-12-01 to 2026-06-02 | Corgan | None found.TDLR |
| txf-2025026552 Digital RealtyProject Gold Phase 2 - DFW44; Project Gold Phase 2 DFW44 | Lewisville, Denton County2501 Edmonds LN | $120M | 3 | 2025-09-01 to 2027-10-29 | M Group Architects; The M Group Architects | None found.TDLR |
| txf-2026008433 Vantage Data Centers TX11TX11 OPEL Fit-Up | San Antonio, Bexar County14720 Omicron Dr | $95M | 1 | 2026-01-07 to 2026-06-12 | Sheehan Nagle Hartray Architects | None found.TDLR |
| txf-2027002672 Circle T Owner LPDAL130 - Data Center | Westlake, Tarrant County13572 N. Main Street | $83M | 1 | 2026-12-01 to 2027-06-01 | Ci Design | None found.TDLR |
| txf-2026003158 Sabey Data CentersSabey Austin Building B: DH B35; Sabey Austin Building B: DH B36 | Round Rock, Williamson County1300 Louis Henna Blvd. | $80M | 2 | 2025-11-01 to 2026-09-01 | Corgan | None found.TDLR |
| txf-2026016734 Prairie Ridge Phase 1 Owner LPAREP Power House Grand Prairie | Midlothian, Ellis County881 Miller Road | $73M | 1 | 2026-04-01 to 2028-04-01 | Ci Architects | None found.TDLR |
| txf-2026007843 Digital RealityDigital Reality DFW37 Suite 110/210 | Garland, Dallas County1502 Ferris Road | $60M | 1 | 2026-06-01 to 2027-02-28 | JHET Architects, PLLC | None found.TDLR |
| txf-2026008115 1515 Roundtable Dr Property LLCPrime DC 3MW Buildout | Dallas, Dallas County1455 Round Table Dr. | $48M | 1 | 2025-12-01 to 2026-06-01 | AO Architects | None found.TDLR |
| txf-2025013924 American Real Estate PartnersAREP Powerhouse Las Colinas | Irving, Dallas County111 Customer Way | $47M | 1 | 2025-09-23 to 2026-08-14 | HKS Inc. | None found.TDLR |
| txf-2025015318 Oppidan5MW Temple Data Center | Temple, Bell County2313 Eberhardt Road | $31M | 1 | 2025-07-14 to 2026-10-16 | Salas O'Brien | None found.TDLR |
| txf-2025025376 MapletreeEvocative DAL6 Infrastructure Upgrades | Plano, Collin County1221 Coit Road | $30M | 1 | 2025-09-05 to 2027-02-27 | Burns Engineering | None found.TDLR |
| txf-2026022947 Data Center Houston, LLCHOU2 CAPACITY EXPANSION | Houston, Harris County5170 WESTWAY PARK BLVD | $20M | 1 | 2026-07-07 to 2027-09-27 | CORGAN | None found.TDLR |
| No filings match. | ||||||
How this is built
Public records only. For each project we chain the named operator to the granting government, then the appraisal district or reinvestment zone, then the Chapter 380, 381 or 312 incentive, then read the status. Megawatts never appear in the incentive record, so each MW figure comes from an external source with a confidence band.
Texas SB 6 restricts what utilities may disclose about named large-load customers, so where a figure is not public we show “not published” rather than an estimate.
The three dollar figures
- TDLR estimate: the registrant's estimate of construction cost for accessibility review, buildings only. It is often shell only or fit-out only, and it excludes power plants, substations and GPUs. A campus appears as many registrations; we sum them, and shell and fit-out registrations can overlap.
- Announced: from a company release, SEC filing or trade report, with its scope named. Statewide pledges (for example Google's $40B for Texas through 2027) are never assigned to a site.
- Incentive-committed: the investment a company committed to in a local agreement, where the text states it.
Source ranking and confidence
- Source order: primary filing, then county record, then company release, then trade press. Trackers are used only to discover names, never cited.
- Confidence: High = a primary document was read. Medium = one primary source read secondhand, or two secondary. Low = a single trade report or unverified.
- Evidence is the count of six observable signals present: a state filing, a local incentive record, an air permit, a named contractor, a supply contract, a confirmed groundbreaking. It replaces the old BUILD/CAUTION verdict, which separated 1 project of 16.
- A role marked “Not publicly named (checked Oct 9, 2026)” means we looked and found none. “Not yet checked” means the project has not been through that pass.
Monthly refresh
Each month we re-search TDLR by owner entity, check county and city agendas and the Comptroller incentive records, re-pull company filings and release pages, re-run the trap checks (shell against fit-out double counting, statewide pledges, cancelled projects), then log every change below with its date. A refresh also runs once after ERCOT's December 10 report.
Compiled by ModalPoint. Corrections: send a correction.
Quote or cite any figure with a link to this page. To show the map on your site, use the embed code under the map.
Cite this page: ModalPoint, “Texas Data Center Map,” updated Oct 9, 2026, modalpoint.com/texas-data-center-map
What changed
Oct 9, 2026: rebuilt around typed dollar figures, coordinates, build dates and named contractors. Retired the BUILD/CAUTION verdict. Added 26 projects and 47 state filings.
Added (27)
- Crusoe Abilene, Microsoft campus
- Stargate Frontier, Shackelford County
- Stargate Milam County
- Chevron and Microsoft, Project Kilby (Reeves County)
- GW Ranch and Amazon, Pecos County
- Prometheus Hyperscale and Istmo, Reeves County
- PowerBridge Alpha Digital Campus, Reeves County
- NRG and LandBridge, Reeves County (potential)
- Poolside Project Horizon, Pecos County
- Fermi America Project Matador, Carson County
- Google, Armstrong County (Crusoe Goodnight)
- Google, Haskell County
- Google Meitner Energy Center, Gray and Roberts Counties
- Meta, El Paso
- Galaxy Helios, Dickens County
- IREN Sweetwater, Nolan County
- IREN Childress
- TeraWulf and Fluidstack, Abernathy
- CloudBurst San Marcos GigaCenter
- Nexus Data Centers, Hubbard
- Texas Critical Data Centers, Odessa
- Nscale and Ionic, Ward County
- Amazon, Floydada
- Amazon, Boling
- Stargate Abilene expansion (+600 MW)
- Diode Ventures, Cedar Creek Lake
- 47 TDLR filings listed separately from projects.
Refreshed monthly and once after ERCOT's December 10 report. Next refresh by Nov 13, 2026.
Questions about Texas data centers
How many data centers are being built in Texas?
We track 42 projects, 25 of them building or running as of Oct 9, 2026. That is a tracked list, not a census. The Governor's August 3, 2026 letter puts the ERCOT connection queue at approximately 474 gigawatts of requested large load, about 90 percent of it data centers, which is far more than will be built.
Who is building data centers in Texas?
Operators with the most projects on this list: Crusoe (6 projects), Amazon Data Services (3 projects), Compass Datacenters (2 projects) and IREN (2 projects). Tenants and customers include Oracle and OpenAI, Microsoft, Google, Meta and Amazon. Each record names the operator, tenant and legal entity.
Where are the biggest data center projects in Texas?
By disclosed scale: Stargate Frontier (Shackelford County, $25B campus), Stargate Abilene (Taylor County, $15B JV financing) and CloudBurst San Marcos GigaCenter (Hays County, $14.5B campus). The scopes differ, so the figures are not comparable one for one. By count of projects, the leading regions are West Texas 10, Permian Basin 10 and North Texas 8.
How much are companies spending on Texas data centers?
Three different figures are published and they are not additive: announced investment (13 projects, largest Stargate Frontier at $25B for the campus), state-filed construction cost (19 projects, $35.9B registered, buildings only), and local incentive commitments (8 projects with a figure). Scope varies from full campus to power plant only.
Do data centers have their own power plants?
Some do. 14 of 21 projects with a sourced power source plan on-site gas generation, alone or with the grid. Example: Chevron and Microsoft plan about 2.67 GW of generation for a Reeves County campus, first power in 2028. Others buy power from the ERCOT grid.
What is the ERCOT pause on new data centers?
On August 3, 2026 the Governor directed regulators to audit data centers advancing through the grid queue. ERCOT paused approvals to energize data centers of 75 MW or more until it files its verification report, due December 10, 2026. Developers of off-grid campuses say the pause does not reach them.
How much power do Texas data centers use?
Planned loads run from tens of megawatts to over a gigawatt per campus. We show IT load, generation and design capacity separately and never add them; a figure is blank when no source states it.
Which Texas counties have the most data center projects?
Reeves County (4), Dallas County (3), Pecos County (3) and Taylor County (3). Counties with the most announced power are not always the ones with the most projects.
How often is this updated, and where does the data come from?
Monthly, plus once after ERCOT's December 10 report. Sources are state filings (TDLR), county and city agreements, the Texas Comptroller incentive database, SEC filings, company releases, and trade press, ranked in that order. See How this is built.
How do I sell to Texas data center projects?
Start with who buys what you sell: gas supply, on-site generation, electrical and EPC work, water, land, site prep. The seller view lists named deals per segment and the contractors, suppliers and developers on each project. See What you sell, and who is already buying it.
Selling into data centers? We map the buyers and help you win the work.
On every project above, someone decides what gets bought: a developer, a general contractor, a power EPC or a plant owner. ModalPoint helps you win that business with buyer mapping, positioning and a go-to-market plan.
42 projects tracked, 25 building or running. Data as of Oct 9, 2026.
30 minutes with someone on our team who works in energy. No obligation either way.