Data Centers Being Built in Texas: Who, Where & How Much Power

A running tracker of the data centers being built in Texas — named operator, county, power draw in megawatts (with sources), the public incentive on file, and a plain build-status read for each project. Assembled from public county records, updated as new filings appear.

16Tracked projects
12Texas counties
11Sourced MW figures
1At BUILD

Power figures are sourced where we can confirm them and shown as “unknown” where we can’t — we never guess a number. Last updated 2026-08-13.

Every tracked Texas data center project

Operator County Power (MW) Incentive Status Source
Lancium Abilene LLC Taylor 1.2GW (~1,200MW) full buildout; ~200MW initial phase
high confidence
Ch.312 abatement
Active
BUILD source
CIPHER BARBER LAKE LLC Mitchell 300MW (full buildout target; interconnection tracker shows 250+ MW proposed)
med confidence
Ch.312 abatement
Active
CAUTION source
Compass Datacenters DFW III, LLC Ellis 360MW campus full buildout (~180MW live across 5 of 10 buildings); DFW III is one sub-building of the Red Oak campus
med confidence
Ch.380/381
On file
CAUTION source
Compass Datacenters DFW LLC Collin unknown (being confirmed) Ch.312 abatement
Active
CAUTION
CoreWeave, Inc. Collin 30 MW facility ceiling (up to; phased); 13.75 MW interconnection-record figure
med confidence
Ch.380/381; Ch.380/381
On file
CAUTION source
Crusoe Energy System, LLC Wilbarger unknown (being confirmed) Ch.312 abatement
Active
CAUTION
Crusoe Energy Systems, LLC Howard unknown (being confirmed) Ch.380/381
On file
CAUTION
Digital Realty Trust, L.P. Dallas unknown (being confirmed) Ch.380/381
On file
CAUTION
Edged Dallas LLC Dallas 24 MW per building; 48 MW total campus at full buildout (2 buildings)
high confidence
Ch.380/381
On file
CAUTION source
Hutto Data Center Campus Power LLC c/o Skybox Datacenters Williamson 600 MW total campus (two dedicated 300 MW substations)
high confidence
Ch.380/381
On file
CAUTION source
Lancium LLC Pecos 25 MW operating, 325 MW planned at full buildout (Fort Stockton Clean Campus; 2021 announcement)
med confidence
Ch.380/381; Ch.380/381
On file
CAUTION source
Oracle America, Inc. Bexar unknown (being confirmed) Ch.380/381
On file
CAUTION
QTS Investments Property Ft. Worth LLC Tarrant 100-250 MW campus range (interconnection tracker); ~70 MW+ existing critical capacity plus a 42 MW expansion building filed 2024
med confidence
Ch.312 abatement
On file
CAUTION source
RIOT PLATFORMS INC Navarro 1,000 MW (1 GW) total ERCOT-approved; 400 MW deployed for Bitcoin, ~600 MW remaining evaluated for AI/HPC
high confidence
Ch.312 abatement
Active
CAUTION source
Sl DFW02A, LLC (STACK) Dallas ~36-47 MW single building (sources conflict); DFW02 campus 216 MW planned, expandable to 500+ MW
med confidence
Ch.380/381
On file
CAUTION source
Switch, Ltd. Williamson ~125 MW at ‘The Rock’ Round Rock campus (up to 185 MW across Switch’s total Texas ecosystem at full buildout)
med confidence
Ch.380/381
On file
CAUTION source

MW figures are external estimates (company, PUCT, ERCOT, trade press), not taken from the incentive record — Texas SB6 bars utilities from disclosing named large-load data, so no one can publish an authoritative MW feed. A “BUILD” read means a confirmed operator + active incentive + a power-favorable model; everything else stays “CAUTION” until power and water are externally confirmed.

How this tracker is built

  • Public records only. Named operator → granting government → county appraisal district / zone → Chapter 380/381 or Chapter 312 incentive → status read. Every row traces to a Texas Comptroller record and a pull date.
  • Power is always sourced. Megawatts never appear in the incentive record, so each MW figure comes from an external source with a confidence band. No source, no number — we show “unknown” instead.
  • Look-alike names are guarded. A ventures firm with a similar name to a data-center operator is quarantined for review, never silently counted.
  • Chapter 313 is expired (Dec 2022) and the JETI program excludes data centers, so the county-incentive trail runs through Chapter 380/381 and Chapter 312 only.

Frequently asked questions

How many data centers are being built in Texas?

This tracker follows 16 assembled data-center / large-load projects across 12 Texas counties as of 2026-08-13, built from public county incentive records. It is a floor, not a full census — projects with no public incentive filing (or filed under a different entity name) are tracked separately.

Which Texas counties have the most data center projects?

In this dataset, Dallas (3), Collin (2), Williamson (2), Bexar (1), Ellis (1) lead by tracked project count.

How much power do Texas data centers use?

Per-project power ranges from tens of megawatts to over a gigawatt at full buildout. Each figure on this page is externally sourced with a confidence band; Texas SB6 bars utilities from disclosing named large-load data, so no authoritative public MW feed exists.

Need this for a specific deal, county, or operator?

ModalPoint runs custom Texas large-load and data-center intelligence for site selectors, developers, and vendors — deeper project detail, power and water context, and the projects that never hit the incentive rail.

Talk to ModalPoint →

Free Consultation

Talk to ModalPoint

A 20-minute call to see if ModalPoint is the right firm and whether the timing makes sense. No obligation either way.